Announcements

PNA is proud to announce the signing of Lighthouse Technical Sales as the exclusive Manufacturers Representative for New England. Lighthouse will be covering the states of ME, NH, VT, MA, CT, and RI.

Please direct inquires to Lighthouse at:
Lighthouse Technical Sales
55 Lake St Unit 3-8 Nashua, NH 03060
sales@lighthouserep.com | Tel: 603-882-8800

“Lighthouse’s Line Card aligns well with PNA’s capabilities and customers. We view this as a partnership and a commitment to our continued growth. We look forward to a very successful relationship."
Mason Fein
Director of Business Development
01 —  NEW YORK · PRECISION CONVERSION SINCE 2019

Precision material
conversion for
mission-critical
aerospace & defense.

Custom conversion of conductive and non-conductive flexible materials for defense, space, and uncrewed systems programs. Zünd digital precision cutting, CAD-driven workflow, and automated dimensional inspection — built for the tolerances, traceability, and turnaround mission programs demand.

ISO 9001:2015  ·  ITAR Registered  ·  DFARS Compliant  ·  Made in USA

25 + YRS

In conversion
for flexible materials

±0.005 IN

Standard dimensional
tolerance

24 HR

Quote turnaround
across capability set

2 ×

Zünd digital
production lines

Engineered
capability stack

Cutting
Zünd digital precision
Inspection
Keyence IM-X1540 vision
CAD workflow
DraftSight · OptiScout
Standards
MIL-DTL-83528 · AS9102
Turnaround
24-hour quote · no minimum
02  Core capabilities

A full capability set,
cut on one digital floor.

Six material families. One CAD-driven production workflow. Every job flows through the same five controlled stages — from file intake through automated dimensional inspection — producing documented, traceable parts that meet or exceed print specification.

Elastomer-Gaskets.png

01 / 06

EMI/RFI Shielding Gaskets

Conductive elastomer gaskets providing continuous electromagnetic shielding while maintaining environmental seal. Silicone & fluorosilicone base filled with a full range of conductive particles.

Fills
Ag-Al / Ag-Cu / Ni-Gr
MIL-SPEC
MIL-DTL-83528
Thermal Gap pad

02 / 06

Thermal Management

Thermal interface materials that dissipate heat from high-power electronics, conform to uneven mating surfaces, and absorb vibration. Gap pads, phase change, and adhesive TIMs.

Conductivity
0.5 – 6.0 W/m·K
Thickness
0.020″ – 0.250″
o-rings

03 / 06

Conductive O-Rings

Electrically conductive elastomer O-rings providing continuous EMI shielding in threaded or flanged enclosures while maintaining environmental seal against moisture and contaminants.

Base
Silicone / FVMQ
Standard
MIL-STD-1344
gaskets.webp

04 / 06

Custom Gaskets & Seals

High-performance environmental gaskets converted from a wide range of rubber grades. Excellent compression set, resiliency, and shock absorption characteristics.

Materials
Silicone · EPDM · Viton
Durometer
30 – 90 Shore A
Electrical Insulation

05 / 06

Electrical Insulation

Dielectric insulation components cut from specialty films and papers for battery packs, high-voltage enclosures, and circuit isolation applications.

Films
Nomex · Mylar · Kapton
Finish
PSA or non-adhesive

06 / 06

Conductive Flange Gaskets

Conductive elastomer flange gaskets for avionics LRU sealing, radar modules, and enclosure joints. Die-free Zünd cutting eliminates tooling cost and enables rapid revisions.

Method
Through / kiss / score
Tolerance
±0.002″ available
03  Production workflow

From CAD file
to inspected part.

Our production workflow is built for repeatability. Every part flows through the same five controlled stages — documented, traceable, and inspection-closed before it leaves the floor.

STAGE 01

CAD design & DFM review

Customer files accepted in DXF, DWG, STEP, IGES, or PDF. Drawn and prepared in DraftSight, then nested for minimal material waste. DFM feedback provided on problematic geometry.

STAGE 02

Material selection & pull

Pulled from in-stock inventory of tier-1 supplier materials — Parker, Laird, Schlegel, Rogers, 3M, DuPont, Kerafol, Fujipoly, Henkel, Saint-Gobain. Full lot traceability maintained.

STAGE 03

Zünd digital precision cutting

OptiScout-driven Zünd XY knife cutter produces through-cuts, kiss-cuts, scoring, and perforation. Digital workflow eliminates die cost and enables rapid revisions and short-run production.

STAGE 04

Automated dimensional inspection

Keyence IM-X1540 Image Dimension Measurement System provides fast, non-contact dimensional inspection with repeatable accuracy. Documented inspection reports available on request.

STAGE 05

Documentation & delivery

Certificate of Conformance, material certifications, and first-article inspection reports included. Expedited shipping available. On-time delivery tracked and reported.

DWG-001  Anatomy of a converted part

Five layers,
cut as one.

A typical EMI/RFI shielding gasket is a deliberate build-up — conductive fabric, elastomer, adhesive, and liner — converted to a single die-free profile that holds dimension and shielding across the mating surface.

Stack
up to 5 layers
Tolerance
±0.002″
Inspection
100% Keyence
12345
Conductive fabric
Shielding performance
Silicone elastomer
Compression + resilience
PSA adhesive
Bond to substrate
Release liner
Clean handling
Die-cut geometry
Precision fit
Exploded material build-up · conductive shielding gasket
04  Inside a conductive gasket

Every quote is read as a blueprint — cut path, material stack, adhesive, and inspection plan resolved before a knife touches material.

1234
Cut path
Precision digital cut to drawing
Material stack
Conductive silicone, Ni / Cu filler
Adhesive optional
Pressure-sensitive adhesive (PSA)
Inspection point
100% dimensional, Keyence vision
Specifications
Material
Conductive Silicone
Thickness
.060" ±.005"
Hardness
50 ±5 Shore A
Surface resistivity
≤ 0.05 Ω/sq
Temp range
−55°C to 200°C
Compliance
RoHS 3, REACH
04  Capabilities matrix

Technical specifications,
standard across material families.

Production capabilities published across all material families. Application-specific requirements may exceed these ranges — send a drawing and our engineering team will confirm feasibility, tolerance, and lead time within 24 business hours.

Outside these ranges?

We regularly deliver
custom solutions beyond
standard capability.

Send your print. If we can convert it, we’ll quote it.

Material thickness0.016″ – 0.250″
Durometer range30 – 90 Shore A
Standard tolerance±0.005″
Tight tolerance±0.002″ on specified features
Cutting methodsThrough · kiss · score · perf
Adhesives3M 300LSE · 9469PC · 467/468MP
Minimum order qtyNo minimum — prototype to production
Accepted formatsDXF · DWG · STEP · IGES · PDF · AI
PackagingBagged · tabbed · kitted · custom
DocumentationCoC · Material cert · FAIR · PPAP

/ At a glance

24-Hour
Quote

Fast response. Fast turnaround.

No Minimum
Order

Prototype to volume. We support you.

Standard
Tolerance
±0.005"

Industry-standard fit.

Tight
Tolerance
±0.002"

For critical features.

05  Industries served

Mission-critical
applications.

PNA parts ship into programs where failure is not an option. Specific application experience across defense, space, aerospace, and emerging uncrewed systems markets.

01 / 06

Defense Electronics

02 / 06

Uncrewed Systems

03 / 06

Space & Satellite

04 / 06

Aerospace

05 / 06

EV & Automotive

06 / 06

Medical & Telecom

Conductive elastomer · silver-filled silicone

“If we can convert it, we'll quote it.

Die-free Zünd cutting · lot-traceable material · 24-hour quote

06  Material partners

Tier-one
material supply.

Active stocking relationships with the world’s leading manufacturers of conductive and non-conductive flexible materials. Material selection stays with the customer — the material your drawing specifies is the material we convert. Full lot traceability on every shipment.

3M

Adhesives · films · thermal

DuPont

Nomex · Mylar · Kapton

Parker Chomerics

CHO-SEAL EMI gaskets

Laird

EMI & thermal materials

Rogers Corp.

High-performance elastomers

Saint-Gobain

Silicone & thermal

Kerafol

Thermal interface materials

Fujipoly

Silicone-based TIMs

Henkel

Adhesives & thermal

Schlegel

EMI shielding

Kemtron

Conductive elastomers

Mast Tech.

Microwave absorbers

Nolato

EMI & sealing

SSP

Silicone sponge

Tecknit

Shielding products

Custom

Don’t see it — we’ll source it

07  Proof of performance

Programs delivered.

Representative programs. Customer and program names withheld per ITAR and NDA restrictions. Full case study details available under executed NDA.

Uncrewed systems

Tier-1 Defense Prime · Uncrewed Aerial System

Drone swarm EMI gasket production

Challenge
1,400 silver-aluminum filled fluorosilicone EMI gaskets at ±0.003″ tolerance, delivered in three weeks to meet a program milestone.

Solution
Stocked Parker CHO-SEAL 1215. First article in 4 days; full run with 100% Keyence dimensional inspection.

Outcome
Delivered on time. Zero rejections at incoming inspection. Added to qualified vendor list for follow-on program.

Tier-2 Defense Sub · Airborne EW System

EW jammer flange gasket run

Challenge
Complex flange geometry with integrated through-holes; prior supplier die-cut parts were dimensionally inconsistent, causing assembly rework.

Solution
Converted to Zünd digital cutting — eliminated die variation, held tolerance across all 240 parts per lot, enabled revisions without tooling cost.

Outcome
Assembly rework reduced from 18% to under 1%. Became sole-source supplier. Extended to follow-on variants.
Thermal Gap pad

Uncrewed Systems OEM · High-Altitude Surveillance

Thermal gap pad for flight computer

Challenge
New flight computer required custom thermal pad geometry with six internal cutouts for component clearance. Prototype-to-production pipeline needed.

Solution
Kerafol Keratherm 86/525 converted on Zünd with kiss-cut delivery on release liner for automated pick-and-place.

Outcome
Prototype delivered in 48 hours. Transitioned to production run of 2,000 units with no design changes. Now a recurring monthly order.

All customer identifiers, program names, and dimensional specifics withheld per active ITAR registration and executed NDAs. Case study packages available under executed agreement.

Delivered on time. Zero rejections at incoming inspection.
1,400 EMI gaskets  ·  21 days  ·  0 rejections   Representative drone-swarm program · details under NDA
08  Quality & compliance

Built for defense-grade
documentation, from day one.

Every shipment arrives with the documentation your quality and procurement teams require. Our systems are built around defense and aerospace compliance from day one — not bolted on.

Certifications & Registrations

ISO 9001:2015
Certified Quality Management System. Audited and maintained by accredited certifying body.
Active
ITAR Registered
U.S. State Department registered for defense article manufacture and technical data handling.
Current
SAM.gov
Active registration with System for Award Management. CAGE code and DUNS on file.
Active
DFARS Compliant
Domestic sourcing available for programs requiring DFARS 252.225-7009 compliance.
Available

Documentation Provided

Certificate of Conformance
Standard with every shipment. Confirms part meets drawing spec.
Standard
Material Certifications
Raw material certs from original manufacturer, lot traceable.
Standard
First Article (AS9102)
AS9102-compliant First Article Inspection reports on request.
On request
PPAP Documentation
Production Part Approval Process packages for automotive / EV.
On request
Dimensional Reports
Keyence IM-X1540 automated inspection reports available per lot.
On request
Export Compliance
End-use statements and ITAR compliance documentation as required.
As required
09  Next steps

Send us
your drawing. Quotes in 24 hours.

Include quantity, material (or application), tolerance requirements, and target delivery date. We’ll respond within 24 business hours with feasibility, lead time, and price.

DXF · DWG · STEP · IGES · PDF · AI